wiki:20_rdc_charger:35_commissioning:05_dlm
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
wiki:20_rdc_charger:35_commissioning:05_dlm [2023/03/31 10:07] – ↷ Links adapted because of a move operation saso.santelj | wiki:20_rdc_charger:35_commissioning:05_dlm [2024/08/26 15:07] (current) – saso.santelj | ||
---|---|---|---|
Line 2: | Line 2: | ||
- | RDX charger | + | RDC Charger |
Overloading causes multiple high-energy appliances working at the same time, such as an oven, dishwasher, heat pump and EV charging.\\ | Overloading causes multiple high-energy appliances working at the same time, such as an oven, dishwasher, heat pump and EV charging.\\ | ||
- | RDX Charger monitors a current draw by appliances and in real time allocates (limits) available capacity allowing them to run without overloading.\\ | + | RDC Charger monitors a current draw by appliances and in real time allocates (limits) available capacity allowing them to run without overloading.\\ |
- | **NOTE**: Power sensor must be mounted so that it can measure power & current on grid (power supply for object/home). | + | **NOTE**: Power sensor must be mounted so that it can measure power & current on grid (power supply for home/facility). |
Procedure to activate Dynamic Load Management is as follows: | Procedure to activate Dynamic Load Management is as follows: | ||
- | * [[wiki: | + | * [[wiki: |
- | * Wire [[wiki: | + | * Wire [[wiki: |
- | * HEMS Configurator -> settings -> select WM/WR binding | + | * HEMS Configurator -> settings -> select WM/WR pairing |
- | {{wiki:rdx_charger: | + | {{wiki:20_rdc_charger: |
* Power sensor is detected. Add it to grid position (4) | * Power sensor is detected. Add it to grid position (4) | ||
- | {{wiki:rdx_charger: | + | {{wiki:20_rdc_charger: |
* Power sensor configured successfully (5) | * Power sensor configured successfully (5) | ||
- | {{wiki:rdx_charger: | + | {{wiki:20_rdc_charger: |
- | * HEMS Configurator -> dlm, enter allowed current value of grid fuses (6) | + | * HEMS Configurator -> DLM, enter allowed current value of grid fuses (6) |
- | * make sure to configure phase order (7) correct, otherwise dynamic load management may not work properly | + | * make sure to configure |
- | * select limiter priority for RDX Charger (8): no limiter, limit last (last to be limited), limit second, limit first (first to be limited) | + | * select limiter priority for RDC Charger (8): no limiter, limit last (last to be limited), limit second, limit first (first to be limited) |
- | {{wiki:rdx_charger: | + | {{wiki:20_rdc_charger: |
wiki/20_rdc_charger/35_commissioning/05_dlm.1680257278.txt.gz · Last modified: 2023/05/26 13:04 (external edit)