+ | ====== Dynamic Load Management ====== | ||
+ | |||
+ | |||
+ | RDC Charger supports power consumption (current draw) control to prevent circuit breaker tripping (overloading). \\ | ||
+ | Overloading causes multiple high-energy appliances working at the same time, such as an oven, dishwasher, heat pump and EV charging.\\ | ||
+ | RDC Charger monitors a current draw by appliances and in real time allocates (limits) available capacity allowing them to run without overloading.\\ | ||
+ | **NOTE**: Power sensor must be mounted so that it can measure power & current on grid (power supply for home/ | ||
+ | |||
+ | Procedure to activate Dynamic Load Management is as follows: | ||
+ | * [[wiki: | ||
+ | * Wire [[wiki: | ||
+ | * HEMS Configurator -> settings -> select WM/WR pairing button and follow [[wiki: | ||
+ | {{wiki: | ||
+ | * Power sensor is detected. Add it to grid position (4) | ||
+ | {{wiki: | ||
+ | * Power sensor configured successfully (5) | ||
+ | {{wiki: | ||
+ | * HEMS Configurator -> DLM, enter allowed current value of grid fuses (6) | ||
+ | * make sure to configure correct phase order (7), otherwise dynamic load management may not work properly | ||
+ | * select limiter priority for RDC Charger (8): no limiter, limit last (last to be limited), limit second, limit first (first to be limited) | ||
+ | {{wiki: | ||