wiki:20_rdc_charger:35_commissioning:02_power_plant
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
wiki:20_rdc_charger:35_commissioning:02_power_plant [2023/03/31 10:12] – ↷ Links adapted because of a move operation saso.santelj | wiki:20_rdc_charger:35_commissioning:02_power_plant [2023/05/26 13:04] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 5: | Line 5: | ||
|< 700px >| | |< 700px >| | ||
^ serial with grid power sensor | ^ serial with grid power sensor | ||
- | | {{ :wiki:rdx_charger: | + | | {{ wiki:20_rdc_charger: |
When configuring the power plant, select | When configuring the power plant, select | ||
Line 19: | Line 19: | ||
|< 700px >| | |< 700px >| | ||
- | | {{ :wiki:rdx_charger: | + | | {{ wiki:20_rdc_charger: |
Add inverter using configurator: | Add inverter using configurator: | ||
* | * | ||
- | {{wiki:rdx_charger: | + | {{wiki:20_rdc_charger: |
* | * | ||
- | {{wiki:rdx_charger: | + | {{wiki:20_rdc_charger: |
wiki/20_rdc_charger/35_commissioning/02_power_plant.1680257556.txt.gz · Last modified: 2023/05/26 13:04 (external edit)