wiki:20_rdc_charger:35_commissioning:02_power_plant
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| wiki:20_rdc_charger:35_commissioning:02_power_plant [2023/03/31 10:07] – removed - external edit (Unknown date) 127.0.0.1 | wiki:20_rdc_charger:35_commissioning:02_power_plant [2023/05/26 13:04] (current) – external edit 127.0.0.1 | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | ====== Power plant connection ====== | ||
| + | The power plants can be connected to the grid in two ways: | ||
| + | |||
| + | |< 700px >| | ||
| + | ^ serial with grid power sensor | ||
| + | | {{ wiki: | ||
| + | |||
| + | When configuring the power plant, select | ||
| + | | ||
| + | | ||
| + | Power plants are configured as internal by default. | ||
| + | |||
| + | Obtaining data (power, voltage, etc...) from power plants is possible in two ways:\\ | ||
| + | 1. adding [[wiki: | ||
| + | 2. connecting PV inverter via Modbus TCP (for SolarEdge inverters only) | ||
| + | |||
| + | === EVSE and PV inverter connection === | ||
| + | |||
| + | |< 700px >| | ||
| + | | {{ wiki: | ||
| + | |||
| + | Add inverter using configurator: | ||
| + | * | ||
| + | {{wiki: | ||
| + | * | ||
| + | {{wiki: | ||
| + | |||
| + | |||
| + | Setup Modbus TCP on Inverter side using SolarEdge SetApp: | ||
| + | * | ||
| + | * RS485-1 -> Protocol -> SunSpec (Non-SE Logger) | ||
| + | * RS485-1 -> Device ID, enter address 1 | ||
| + | * Modbus TCP -> Enable | ||
| + | * set TCP port -> 502 | ||
| + | |||
| + | **Note**:\\ The TCP server idle time is 2 minutes. In order to leave the connection open, the request should be made within 2 minutes.\\ | ||
| + | First, add inverter to Configurator, | ||