+ | ====== Commissioning ====== | ||
+ | |||
+ | when the charger is mounted (on wall or freestanding set) , properly connected, we can continue with the commissioning. | ||
+ | |||
+ | Strictly follow [[wiki: | ||
+ | |||
+ | :!: **Once RDC Charger is configured, it does not require further connection to internet or configurator for normal operation !** | ||
+ | |||
+ | ===== Configuration===== | ||
+ | |||
+ | Install and run [[wiki: | ||
+ | |||
+ | |||
+ | ==== Setting device management features ==== | ||
+ | |||
+ | For each consumer we can set: | ||
+ | * **sub**: mark device as a submeter if device is not part of internal network and/or is not connected as intended by default. Energy division for this device will be ignored. | ||
+ | * **man. time**: the time is in minutes for the manual override. It serves to ensure that the user can ensure a minimum validity of the manual switchover. | ||
+ | * **P nominal**: nominal power in watts used for consumers without power sensor. It ensures energy consumption calculation while in active mode. | ||
+ | * **timetable checkbox**: enable or disable the timetable for each device. | ||
+ | |||
+ | {{wiki: | ||
+ | |||
+ | ==== Enable power sensor from compatible systems ==== | ||
+ | |||
+ | HEMS will automatically detect compatible | ||
+ | * battery systems **eStore** and | ||
+ | * home automation systems **HIQ Home** | ||
+ | which are in the same local network. | ||
+ | |||
+ | Only the first system is detected, if there is more than one it is necessary to enter the NAD number of the desired system manually. | ||
+ | |||
+ | if **eStore** is **enabled**, | ||
+ | * **grid** power-sensor | ||
+ | * power-sensor for the **first PV Plant** and | ||
+ | * power-sensor of the **first storage** system | ||
+ | |||
+ | From the **enabled** **HIQ Home** system, HEMS will automatically read the **grid** power-sensor. | ||
+ | |||
+ | ==== Internet access ==== | ||
+ | |||
+ | RDC Charger is connected to the internet via IOT-L2-2 linker. | ||
+ | |||
+ | ==== Digital output ==== | ||
+ | |||
+ | RDC Charger is supporting up to 8 digital outputs by [[wiki: | ||
+ | * [[wiki: | ||
+ | |||
+ | {{wiki: | ||
+ | |||
+ | * [[wiki: | ||
+ | |||
+ | {{wiki: | ||
+ | |||
+ | **Note**: Nominal power **P nominal** is suitable for consumer(s) without connected power sensor. It is used for consumed energy calculation during active mode. | ||
+ | |||
+ | |||
+ | ==== IO mux ==== | ||
+ | |||
+ | [[wiki: | ||
+ | * WR 1 -> to Router reset, when conditions for router reset are met, WR 1 module will change relay state (turns ON/OFF router wired to WR module), | ||
+ | * or when WR 5 -> Digital-2, it means that change of digital2 (consumer 2) reflects on WR 5 relay state. | ||
+ | |||
+ | {{wiki: | ||
+ | |||
+ | ==== Permanent memory ==== | ||
+ | |||
+ | [[wiki: | ||
+ | After parameters modification, | ||
+ | |||
+ | {{wiki: | ||
+ | |||
+ | ==== Backup / restore to PC ==== | ||
+ | |||
+ | HEMS Configurator allows you to backup and restores all parameters to PC. | ||
+ | |||
+ | ==== Phase alignment and limiter settings ==== | ||
+ | |||
+ | Under limiter page set correct phase order to align phases of each device. Set correct main fuse limit [A] to protect the main grid fuse from over current. Check devices that can be managed by limiter and set correct limiter priority. Choose from no limiter, limit last, limit second, limit first. Max expected device current consumption is dynamically calculated and does not need to be set. In case device is an EV charging station, manually set max current for this device. | ||