wiki:20_rdc_charger:35_commissioning:05_dlm
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
wiki:20_rdc_charger:35_commissioning:05_dlm [2023/08/02 13:41] – saso.santelj | wiki:20_rdc_charger:35_commissioning:05_dlm [2023/08/02 13:42] – saso.santelj | ||
---|---|---|---|
Line 2: | Line 2: | ||
- | RDX charger | + | RDC Charger |
Overloading causes multiple high-energy appliances working at the same time, such as an oven, dishwasher, heat pump and EV charging.\\ | Overloading causes multiple high-energy appliances working at the same time, such as an oven, dishwasher, heat pump and EV charging.\\ | ||
- | RDX Charger monitors a current draw by appliances and in real time allocates (limits) available capacity allowing them to run without overloading.\\ | + | RDC Charger monitors a current draw by appliances and in real time allocates (limits) available capacity allowing them to run without overloading.\\ |
**NOTE**: Power sensor must be mounted so that it can measure power & current on grid (power supply for object/ | **NOTE**: Power sensor must be mounted so that it can measure power & current on grid (power supply for object/ | ||
wiki/20_rdc_charger/35_commissioning/05_dlm.txt · Last modified: 2023/08/02 13:47 by saso.santelj